Project Constraints Management and Completion of Constituency Development Fund Projects in Nairobi City County, Kenya
DOI:
https://doi.org/10.70619/vol2iss6pp1-13Keywords:
Time, quality, cost, resources, project completionAbstract
Due to fundamental flaws in its legal framework, the constituency development funds' implementation is marked by controversies and hostility. For example, the constituency development funds' design discourages integration with current development mechanisms, leading to overlap and, occasionally, double funding. Additionally, the fund is managed in an undemocratic manner with little accountability. Project completion has been delayed as a result of this. Therefore, the purpose of this study was to investigate the influence of project constraints management on the completion of Constituency Development Fund projects in Nairobi City County. Specifically, the study sought to determine the influence of time, quality, cost, and resource management on the completion of Constituency Development Fund projects. The study employed both descriptive and explanatory research designs. The unit of analysis was seven secondary education projects funded through the constituency development funds in Roysambu Sub-County between the years 2015 and 2019. The unit of observation was 84 project management committee members. The findings indicated that time management, quality management, cost management, and resource management had a positive and significant influence on the completion of Constituency Development Fund projects. The study concluded that prioritization of projects based on their needs enhanced their completion. Timely allocation of resources during project implementation enhanced project success. Lack of quality checks during project implementation delayed project success. Further, regular budget review and regular review of various projects for various projects enhanced project success. The study recommended that the project managers in various constituency projects should ensure that the goals of the projects are set early enough to enhance project success. The project managers should ensure they employ qualified quality assurance officers who can be able to do standard quality checks of projects. The study suggested that constituency managers have a clear vision and objectives that place a priority on resource mobilization. Additionally, it is advised that the government constantly make sure to allocate enough funding for the projects to ensure completion.
References
Abobakr, A. (2018). The necessity of Cost Management Process (Pre & Post Contract Stage) In Construction Projects: Cost Management in Pre & Post Contract. (Unpublished Doctoral Dissertation, University of Applied Sciences
Aggor, K. K. (2017). Relationship Between Budget and Project Success Factors in the Ghanaian Building Construction Sector. (Doctoral Dissertation, Walden University)
Aira, E. A. (2016). Factors Influencing Performance of Non-Governmental Organizations Projects in The Urban Informal Settlements: A Case of Undugu Society of Kenya, Nairobi County (Doctoral dissertation, University of Nairobi).
Aje, I. O., Adedokun, O. A., & Ibironke, O. T. (2014). Time and cost models for building projects using prequalification and contract award data in Nigeria. Journal of Environmental Design and Management, 6(1&2), 122-131.
Barasa, R. M. (2014). Influence of monitoring and evaluation tools on project completion in Kenya: A case of constituency development fund projects in Kakamega a County, Kenya (Doctoral dissertation).
Costin, H. I. (1994). Readings in total quality management. Dryden Press.
Eskerod, P., Huemann, M., & Savage, G. (2015). Project stakeholder management–past and present. Proj Manag J 46 (6): 6–14.
Evans, J. R., & Lindsay, W. M. (1993). The Management and Management of Quality. 1999. South-Western College Publishing, Cincinnati.
Faremi, J. O., Ogunsanmi, E. O., & John, I. B. (2016). Factors Affecting Cost and Time Management in Construction Projects. Available at: https://www.researchgate.net/ publication/337570009.
Gashuga, D., Kule, J. W., & Ndabaga, E. (2016). Effect of funds management on project performance in Rwanda case study of dairy community processing center project Burera district. International Journal of Scientific and Research Publications, 6(10), 628-649.
Gaturu, N. S., & Muturi, W. (2014). Factors affecting the timeliness of completion of donor-funded projects in Kenya: a case of world agroforestry center (ICRAF). European Journal of Business Management, 2(1), 189-202.
Kahiga, L. W. (2015). Factors influencing completion of irrigation projects in Kenya: a case of national irrigation board projects in Mount Kenya region (Doctoral dissertation, University of Nairobi).
Kwasira, L. A., Wambugu, D. G., & Wanyoike, D. M. (2016). Influence of Quality Management Practices on Successful Completion of Building Construction Projects In Nakuru Town, Kenya. International Journal of Innovation and Scientific Research, 27(1), 16-22.
Meijer, F., & Visscher, H. (2017). Quality management of constructions: European trends and developments. International Journal of Law in the Built Environment.
Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446-457.
Mumbi, M. (2020). Influence of Management of Project Constraints on Completion of Building Construction Projects in Nakuru County, Kenya. The International Journal of Business Management and Technology, 4(2), 1-15.
Mwirabua, M. D., & Mohinder, J. K. (2020). Determinants of completion of construction projects in public secondary school in Meru County, Kenya. International Academic Journal of Information Sciences and Project Management, 3(6), 71-83.
Olawale, Y. A., & Sun, M. (2010). Cost and time management of construction projects: inhibiting factors and mitigating measures in practice. Construction management and economics, 28(5), 509-526.
Salunkhe, A. A., & Patil, R. S. (2014). Effect of construction delays on project time overrun: Indian scenario. Int. J. Res. Eng. Technol, 3(1), 543-547.
Salvi, M. S. S., & Kerkar, M. S. S. (2020). Quality Assurance and Quality Management for Project Effectiveness in Construction and Management. Available at https://www.researchgate.net/publication/339136518
Sambasivan, M., Deepak, T. J., Salim, A. N., & Ponniah, V. (2017). Analysis of delays in the Tanzanian construction industry. Engineering, Construction, and Architectural Management.
Sanchez, O. P., & Terlizzi, M. A. (2017). Cost and time project management success factors for information systems development projects. International Journal of Project Management, 35(8), 1608-1626.
Tsubura, M. (2014). Accountability and clientelism in dominant party politics: the case of a Constituency Development Fund in Tanzania (Doctoral dissertation, University of Sussex).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Mary Kinanu Kinoti , Dr. Paul K. Sang
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.