Critical Success Factors and Performance of Water Projects in Machakos County, Kenya
DOI:
https://doi.org/10.70619/vol1iss2pp25-37Keywords:
Critical success factors, funds availability, stakeholders’ participation, technical capacity, organizational culture, performance of water projectsAbstract
The increasing crisis on water causes a big threat towards the progress of the world to viable development1in the new1millennium. However, the performance of water projects especially in the developing economies has registered low performance levels. This study, therefore, sought to analyze critical success factors on the performance of water projects by Machakos County Government, Kenya. The study used a descriptive survey research design. The study established that funds availability, stakeholders’ participation, technical capacity, and organizational culture positively and significantly determine the performance of water projects. The study recommended that all county governments must always ensure proper projections are made before the commencement of the projects’ works. Also, the management of water projects funded by the counties should come up with effective communication channels between parties engaged in the project implementation process. The study recommended that to enhance technical capability and capacity, county governments should embrace the current drilling machinery and equip county engineers with skills that match with current trends. Given that the success of county water projects depends on strong cohesive organizational culture, it’s therefore paramount for all counties to continually nurture their organizational culture for better results.
References
Agyeman, D. K. (2015). Sociology of education for Africa students. Accra: Black Mask Limited Publishers Limited.
Baietti, A., & Raymond, P. (2015). Financing water supply and sanitation investments: utilizing risk mitigation instruments to bridge the financing gap.
Franks, T. R. & Curswoth, J. (ed) (1993). Managing Projects in Developing Countries. Pearsons Education Ltd. Edinburgh Gate.
Koskela, L. J., & Howell, G. (2002). The underlying theory of project management is obsolete. In Proceedings of the PMI research conference (pp. 293-302). PMI.
Marangu, I. M. (2016). Factors influencing sustainability of community-based projects in Kenya: A case of Kiirua Kathita water project in Meru County. International Academic Journal of Information Sciences and Project Management, 3(4), 631-654.
Mwakajo, I. S., & Kidombo, H. J. (2017). Factors influencing project performance: A case of county road infrastructural projects in Manyatta Constituency, Embu County, Kenya. International Academic Journal of Information Sciences and Project Management, 2(2), 111-123.
Naidoo, A. (2011). The role of monitoring and evaluation in promoting good governance in South Africa: A case study of the Department of Social Development. Doctoral dissertation, University of Witwatersrand.
Sánchez Delgado, M. (2015). Administación 1. Grupo Editorial Patria.
Savoldelli, A. (2014). Managing a public sector project: the case of the Italian Treasury Ministry. International Journal of Project Management, 22(3), 213-223.
Sharma, M. (2015). Volunteers and community-based rehabilitation. Asia Pacific Disability Rehabilitation Journal, 12, 141-148.
Soumaré, I., Gohou, G., & Kouadio, H. (2016). Comparative study of the characteristics of FDI from China to Africa versus developed countries. Transnational Corporations Review, 8(3), 165-177.
Sunjka, B.P., Jacob, U. (2017). Significant Causes and Effects of Project Delays in the Niger Delta Region, Nigeria. In: Proceedings, SAIIE25, Stellenbosch, pp. 641–654.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Donatter Mwikali Muema , Dr. Lucy Ngugi
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.